Every project goes through the same seven stages. Some of them run on systems we built ourselves.

  1. 01Proposal
  2. 02Design
  3. 03Build
  4. 04Test
  5. 05Install
  6. 06Run
  7. 07Wrap
Team
Experience designCustom developmentIntegration testOn-site installationRemote operations
  1. 01

    Proposal

    Misea

    A project starts as a layout. Venue, equipment, visitor flow and cabling go onto one drawing in Misea, so the proposal already fits the room and already carries an equipment list.

  2. 02

    Design

    Experience design

    The team designs the visitor's path through the experience and what responds to them along it. The layout from the proposal stays in use, so each change to the design is checked against the room.

  3. 03

    Build

    InterKit · Custom development

    Luxmin builds all of it in-house, software and hardware together: sensing, circuits, control and content. The electronics side of this work is InterKit.

  4. 04

    Test

    Integration test

    Every system runs for at least 24 hours without stopping before it leaves. It is checked for heat, power, leakage and water, and for whether it holds when knocked or shaken.

  5. 05

    Install

    On-site installation

    The team installs on site and brings the system up against the same drawing it was planned on. The machines are then set to power on, start the show and shut down on a schedule.

  6. 06

    Run

    KitOps · Remote operations

    While the show is open, the agent on every machine reports its health and counts every interaction. If a machine goes quiet, the team is alerted and maintains it remotely from Taipei.

  7. 07

    Wrap

    KitOps

    The project closes on what KitOps recorded: how many times the experience was used, at what hours, and how people moved through the space.